Eskay Creek Infill Drilling Highlights - 21B and 21C Zones
- 23 g/t Au, 1,605 g/t Ag (43.63 g/t AuEq) over 2.79 m (SK-20-589)
- 92 g/t Au, 258 g/t Ag (24.36 g/t AuEq) over 6.45 m (SK-20-591)
- 50 g/t Au, 182 g/t Ag (10.92 g/t AuEq) over 10.75 m (SK-20-596)
- 13 g/t Au, 613 g/t Ag (31.30 g/t AuEq) over 4.10 m (SK-20-598)
- 52 g/t Au, 92 g/t Ag (3.75 g/t AuEq) over 27.22 m (SK-20-607)
- 74 g/t Au, 247 g/t Ag (9.04 g/t AuEq) over 12.75 m (SK-20-623)
- 38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626)
- 82 g/t Au, 25 g/t Ag (9.15 g/t AuEq) over 25.50 m (SK-20-627)
High-Grade Intersections Continue to Develop within 21C Zone Development Buffer
Intercepts from the completed Phase 2 program continue to demonstrate the tenor, continuity, and thickness of the pit-constrained resources in the 21C Zone at Eskay Creek. This is highlighted by an intercept of 5.38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626) which confirms the continuity and grade modelled in this portion of the 21C Zone, and is corroborated by 8.82 g/t Au, 25 g/t Ag (9.15 g/t AuEq) over 25.50 m in a flanking drill hole (SK-20-627). Mineralization in this area is gold-dominant and is hosted within the footwall rhyolite with only minor grade contributions from silver. These drill holes are situated 75 m north of previously reported 7.17 g/t Au, 146 g/t Ag (9.12 g/t AuEq) over 49.60 m (SK-20-579).
The Phase 1 and 2 drilling campaigns have successfully confirmed the spatial continuity and tenor of the mineralization of the Inferred resources defined by the Company’s 2019 Mineral Resource Estimate (MRE). The incoming assay results from the Phase 2 infill drilling program continue to validate the predicted and modelled Inferred mineralization which was informed by widely spaced historical drill holes in the Skeena 2019 MRE.
About Skeena
Skeena Resources Limited is a Canadian mining exploration company focused on developing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a robust Preliminary Economic Assessment in late 2019 and is currently focused on infill and exploration drilling at Eskay Creek to advance the project to Prefeasibility. Skeena is also exploring the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
Walter Coles Jr.
President & CEO
Contact Information
Investor Inquiries: info@skeenaresources.com
Office Phone: +1 604 684 8725
Company Website: www.skeenaresources.com
Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Company’s Exploration Managers, Raegan Markel, P.Geo. and Adrian Newton, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.
Quality Assurance – Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.
Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.
Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute “forward looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet management’s expectations. Forward-looking statements and information may be identified by such terms as “anticipates”, “believes”, “targets”, “estimates”, “plans”, “expects”, “may”, “will”, “could” or “would”. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.
Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.