Second Quarter Production

(PresseBox) ( Herisau, )
Griffin Mining Limited ("Griffin" or the "Company" - https://www.commodity-tv.com/ondemand/companies/profil/griffin-mining-ltd/ ) is pleased to announce production results for the three months to 30th June 2021.

Overview

Mining and processing have now reached the equivalent of over a million tonnes of ore per annum all of which has been extracted from Zone III with Zone II yet to come into production. Tonnes processed in the second quarter of 2021 were up 37.1% on that achieved in the second quarter of 2021 and zinc metal in concentrate produced was up 38.1% on that achieved in the second quarter of 2020.

Chairman Mladen Ninkov commented, “A tremendous first half year performance, traditionally the Company’s weakest period due to Chinese New Year, where our performance target outlined to shareholders for 2021 is on track to be achieved. Mining and processing, on a monthly basis, have now reached the equivalent of 1.2 million tonnes of ore per annum throughput, all of which has been extracted, as planned, from Zone III. Zone II mine design has been completed and is on target to begin production in 2022. When combined with existing Zone III production, this will enable the Company to deliver on its commitment to reach the 1.5 million tonne production throughput by the end of 2022. Quite frankly, I couldn’t be prouder of this tight band of directors, senior ex pat staff, Chinese employees and contractors. A fantastic team effort.”

About Griffin Mining Limited 

Griffin Mining Limited’s shares are quoted on the Alternative Investment Market (AIM) of the London Stock Exchange (symbol GFM). Griffin Mining Limited owns and operates through its 88.8% owned Joint Venture in China  the Caijiaying Zinc Gold Mine, a profitable mine producing zinc, gold, silver, and lead metals in concentrates. For more information, please visit the Company’s website giffinmining.com.

Further information

GRIFFIN MINING LIMITED

Mladen Ninkov – Chairman                             Telephone: +44(0)20 7629 7772

Roger Goodwin – Finance Director

PANMURE GORDON (UK) LIMITED                        Telephone: +44 (0)20 7886 2500

John Prior

Alisa MacMaster          

BERENBERG                                                      Telephone: +44(0)20 3207 7800

Matthew Armitt

Jennifer Wyllie

Deltir Elezi

BLYTHEWEIGH

Tim Blythe                                                      Telephone: +44(0)20 7138 3205

SWISS RESOURCE CAPITAL AG

Jochen Staiger                         

info@resource-capital.ch 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014
The publisher indicated in each case is solely responsible for the press releases above, the event or job offer displayed, and the image and sound material used (see company info when clicking on image/message title or company info right column). As a rule, the publisher is also the author of the press releases and the attached image, sound and information material.
The use of information published here for personal information and editorial processing is generally free of charge. Please clarify any copyright issues with the stated publisher before further use. In the event of publication, please send a specimen copy to service@pressebox.de.