ENTSO-E briefing paper to EC regarding risks to interconnected system operations in Central Europe

(PresseBox) ( Brussels, )
ENTSO-E briefing paper to EC regarding risks to interconnected system operations in Central Europe ENTSO-E's President Daniel Dobbeni wrote to the European Commissioner for Energy Günther Oettinger on 17 April 2012 and the accompanying paper analysed the risks to interconnected system operations in Central Europe.

The paper highlights that European transmission system operators (TSOs) have managed a tense situation over the winter period and that Member States have become increasingly concerned about loop flows affecting TSOs ability to manage security of supply.

The paper proposes a number of measures to reduce the operational risks TSOs are facing.

Related Documents

ENTSO-E Letter to Commissioner Oettinger 17 April 2012
120313_ Briefing Paper to EC regarding interconnected system operation conditions in Continental Central Europe
The publisher indicated in each case is solely responsible for the press releases above, the event or job offer displayed, and the image and sound material used (see company info when clicking on image/message title or company info right column). As a rule, the publisher is also the author of the press releases and the attached image, sound and information material.
The use of information published here for personal information and editorial processing is generally free of charge. Please clarify any copyright issues with the stated publisher before further use. In the event of publication, please send a specimen copy to service@pressebox.de.